Boeckman Creek Flow Mitigation Site
The City is required by state law to remove the existing flow control structure under the proposed bridge on Boeckman Road over Boeckman Creek. Stormwater runoff has been historically directed away from its natural drainage towards Boeckman Creek. This project will redirect run-off to the natural drainage heading south from the Siemens site under I-5 and to the west. This project will improve the drainageway through grading, vegetation management, and culvert modifications where necessary.
More information will be available as the predesign and data collection is complete.
If you have questions about this project that the website doesn’t address, contact:
Andrew Barrett at 503-570-1567
Status Updates
Project schedule is shown below.
- Predsign: Spring - Summer 2024
- Design: Fall 2024 - Summer 2025
- Construction: Summer 2025 - Winter 2026
- Completion: Winter 2026