Boeckman Creek Flow Mitigation Site

Boeckman Creek Flow Mitigation Site Vicinity Map
Project ID: 
7068
Project Type:
Capital Project
Project Status: 
Design
Property Owners: 
City of Wilsonville
Design Engineer: 
Brown and Caldwell
Contractor: 
TBD
Funding Source: 
Stormwater Operating Fund
Location: 
See maps
SW Parkway and SW Ash Meadows
Wilsonville, OR 97070

The City is required by state law to remove the existing flow control structure under the proposed bridge on Boeckman Road over Boeckman Creek.  Stormwater runoff has been historically directed away from its natural drainage towards Boeckman Creek.  This project will redirect run-off to the natural drainage heading south from the Siemens site under I-5 and to the west.  This project will improve the drainageway through grading, vegetation management, and culvert modifications where necessary.

More information will be available as the predesign and data collection is complete.

If you have questions about this project that the website doesn’t address, contact:   

Andrew Barrett at 503-570-1567 

 

Boeckman Mitigation Taxlot Map
Status Updates

Project schedule is shown below. 

  • Predsign:             Spring - Summer 2024
  • Design:                 Fall 2024 - Summer 2025
  • Construction:   Summer 2025 - Winter 2026
  • Completion:      Winter 2026