5th Street to Kinsman Road Extension RFQ/SOQ

Bid/RFP Status: 
Closed - no longer accepting bids and proposals
Bid/RFP Due Date: 
Wednesday, April 3, 2019 - 2:00pm

Qualified:

  • Emery and Sons Construction Group, LLC
  • James W. Fowler Co.
  • Goodfellow Brothers, LLC
  • Kerr Contractors Oregon, Inc.
  • Kiewit Infrastructure West Co.
  • Moore Excavation, Inc.
  • Pacific Excavation, Inc.
  • Tapani, Inc.
  • Wildish Standard Paving Co.

Work will include a 1,600 foot extension of SW 5th Street (asphalt roadway), a 1,150 foot extension of SW Kinsman Road (PCC roadway), a 1,900 foot extension of the Ice Age Tonquin Trail multi-use path, construction of two bridges over Coffee Lake Creek (85-ft and 90-ft lengths), a 660-foot reconstruction of Boones Ferry Road; a 2,500 foot extension of 15” sanitary sewer main, 3,100 foot extensions of water mains, stormwater infrastructure, water quality facilities, installation of curb, gutter, sidewalk, streetlights, signage, striping and landscaping and irrigation; installation of conduit and vaults; plus other miscellaneous work (Project).  Part of the work will include coordination with Portland & Western Railroad to upgrade the 5th Street crossing and install utilities underneath.